Bolívar: Under-Construction Beachside

From Arknights Terra Wiki
Jump to navigation Jump to search
Bolívar
Under-Construction Beachside
Contingency Contract
Under-Construction Beachside map.png
Lady Candela has carved out a corner of Dossoles's artificial beach to allow the newly-arriving Durin architects to show off their talents, but when these "geniuses" get sloshed with the local workers and start making a scene, someone needs to teach them a lesson.
<Deep Water Zone> Unable to deploy on these tiles. Enemies on these tiles have reduced ASPD and Movement Speed, and continually lose HP
<Custom Floating Platform> Can be deployed on Deep Water Zones, thereafter any unit can be deployed on that tile. The platform is destroyed when the deployed unit retreats.
Appearances: C.C. Fake Waves (Permanent Site), C.C. Base Point (Rotating Site #6)

Information

Unit Limit Initial DP Life Points Enemies
9 10 3 47
Deployable devices Custom Floating Platform ×4
Terrain properties Enemies on Deep Water Zones have their ASPD and speed reduced by 60%, and takes 40 True damage every second.
Addendum
There are pre-deployed Custom Floating Platforms on C5, C8, C10, D5, E5, F5, G5, G9, G10, and G11.

Enemies

Normal Diver ×2, Delinquent ×6, Delinquent Boss ×4, Sandcastle Builder ×5, Ergate ×7, Ergate Leader ×11
Elite Dockworker ×4, Dockworker Leader ×2, Full Metal Surfing Instructor ×3, Fully-Enclosed Beach Buggy ×3

Guide

Under-Construction Beachside guide.png