Bolívar: Under-Construction Beachside
Jump to navigation
Jump to search
Operation | Contracts | Guide |
Bolívar Under-Construction Beachside |
Contingency Contract |
Lady Candela has carved out a corner of Dossoles's artificial beach to allow the newly-arriving Durin architects to show off their talents, but when these "geniuses" get sloshed with the local workers and start making a scene, someone needs to teach them a lesson. <Deep Water Zone> Unable to deploy on these tiles. Enemies on these tiles have reduced ASPD and Movement Speed, and continually lose HP <Custom Floating Platform> Can be deployed on Deep Water Zones, thereafter any unit can be deployed on that tile. The platform is destroyed when the deployed unit retreats. Appearances: C.C. Fake Waves (Permanent Site), C.C. Base Point (Rotating Site #6)
|
Information
Unit Limit | Initial DP | Life Points | Enemies |
---|---|---|---|
9 | 10 | 3 | 47 |
Deployable devices | Custom Floating Platform ×4 | ||
Terrain properties | Enemies on Deep Water Zones have their ASPD and speed reduced by 60%, and takes 40 True damage every second. | ||
Addendum | |||
There are pre-deployed Custom Floating Platforms on C5, C8, C10, D5, E5, F5, G5, G9, G10, and G11. |
Enemies
Normal | Diver ×2, Delinquent ×6, Delinquent Boss ×4, Sandcastle Builder ×5, Ergate ×7, Ergate Leader ×11 |
---|---|
Elite | Dockworker ×4, Dockworker Leader ×2, Full Metal Surfing Instructor ×3, Fully-Enclosed Beach Buggy ×3 |